Fire Station #12 – Knoxville, TN

This fire station was saved from demolition and completely remodeled. A new commercial hood complete with grease duct and an exhaust fan were installed. The generator for the station was replaced and upgraded. This called for a new main gas line to be ran to the generator. Along the renovation there were also several smaller replacements and repairs to the HVAC system. This fire station is now complete and ready to serve the community.


 

Display Garage – Morristown, TN

The project consisted of conditioning 5,700 square feet of entertainment and office space as well as heating 10,000 square feet of garage space. The job required custom duct work throughout the building in order to make the appearance visually appealing. We also ran gas lines throughout the garage to fire places, a grill, heaters, furnaces and water heaters.


 

Rusty Wallace Chevrolet – Remodel

Installation of five new roof top package units to serve remodeled spaces. This included two showrooms, parts center, break room, lounge and several offices. Two of the units required completely new duct systems while the other systems duct work was retrofitted to accommodate the new layout.


 

Farragut Town Hall – Unit Replacement

Replaced 5 sets of twined furnaces along with 5 condensers and evaporator coils. There was also a need to replace one additional condenser. All of this work was accomplished in a professional manner while making downtimes as short as possible for our customer. The job was completed on time and to our customers expectations.


 

TAC Air – Knoxville

A 2,000 sq. ft. addition to the lobby as well as a new line shack were added to TAC Air at Mcghee Tyson Airport. During the addition the lobby was also completely renovated. In total 2 new package units were added to serve the new space while 9 existing units were replaced.


 

Tennessee College of Applied Technology – Knoxville

This project was for the State of Tennessee and consisted of replacing an air cooled chiller, boiler, 4 pumps and installing two variable frequency drives. The project went smoothly and on time. We received a perfect score on our performance review. All parties have been very satisfied with the results of the project.